you are here:   / Resources / Finite Element Analysis of Pile Group Foundation of Sutong Bridge Using CivilFEM with ANSYS

Finite Element Analysis of Pile Group Foundation of Sutong Bridge Using CivilFEM with ANSYS

The Sutong Bridge, crossing China's Yangtze River is one of the world's longest cable-stayed bridges.  The pile group foundation was analyzed using CivilFEM for ANSYS and the data from the nonlinear analysis of the soil- structure interaction between the pipe and soil validated experimental data.